Verotec Helps Keep Nuclear Power Station Running Safely

September 1, 2020 Verotec, Inc

Heysham Nuclear Power station runs four AGR reactors on its site in the North West of the UK. Verotec was approached by Beran Instruments, a certified F4N (Fit for Nuclear) company, to provide custom 19" subracks to house upgraded power supplies on the site. Verotec was selected as the hardware supplier because of its extensive standard product portfolio and its in-house design and manufacturing capability.

The Verotec KM6-II subrack system was selected as the standard product platform because of its field-proven installed base, its strong and rugged design, its extensive range of standard sizes and its wide choice of accessories. The custom system consists of matched pairs of special 4U/84HP/360mm deep KM6-II subracks with vented EMC covers and custom machined rear panels. The complete system comprises various widths of plug-in units to house the modules with machined and digitally printed front panels. One of the two subracks is fitted with a custom metal backing plate to support H15 DIN connectors; both versions are fully EMC screened, and are fitted with a special interlock bar to the front of the subracks to prevent unauthorized removal of the plug-in modules.

For more information, visit: https://www.verotec.co.uk/

Previous Article
WINSYSTEMS Debuts Panel PC for Mil/COTS and Industrial IoT Applications
WINSYSTEMS Debuts Panel PC for Mil/COTS and Industrial IoT Applications

Open-frame PPC3-12-413 delivers connectivity and continuous performance in -10°C to +70°C environments wit...

Next Article
Litemax Brings Intel 8th/9th CPU Industrial Motherboards & Computers for AIoT Era
Litemax Brings Intel 8th/9th CPU Industrial Motherboards & Computers for AIoT Era

Litemax's SKM boards, ASKM-CFL3, is equipped with Intel® 8th Generation Core™ Processor (Coffee Lake-H), tw...